Explosives bring down section of old Milton-Madison bridge – VIDEO

Email this to someoneShare on Facebook0Tweet about this on TwitterShare on LinkedIn13

mmbridgeMILTON, KENTUCKY – Explosives brought down a section of the old Milton-Madison bridge early Tuesday.

The charges went off at 9:13 a.m. eastern time, bringing down a 700-foot section of the bridge.

Implosion had been delayed for several days because of high water levels and a swift current on the Ohio River.

Advanced Explosives Demolition, Inc. is the implosion contractor.